lcc3.10更新咯,for sl下载

by shine on 九.24, 2009, under 数字生活, 玩软件

罗技的效率还是很高的!这么快下载就来了!

下载点这

Update:

The LCC 3.1 should be available tonight or tomorrow.

LCC3.1 brief summary:

- Supports both 32bit and 64bit Snow Leopard

- Backwards compatible with all LCC supported devices

Reported problem not yet addressed:

-Mac shortcut key is not yet addressed

Reported problem still under investigation:

1. mx620: strange click behavior with “menu” item

2. MX1100: Scroll Freezes on some applications

3. Cursor: Jumping cursor with World of Warcraft

It is still being investigated but something to do with Scroll Enhancer implementation in LCC.

The following workaround will impact the scrolling performance, please try and see if works for you.

Workaround:

- Locate Scroll Enhancer files and move to different folder or Desktop

- If it did work for you, keep it as is

- If it did not work for you, move the files back to its original location

File Name: Location:

LCC Scroll Enhancer.bundle /Library/Application Support/Logitech

LCC Scroll Enhancer Loader /Library/InputManagers

LCC Scroll Enhancer Loader.osax /Library/ScriptingAdditions

==================================================

Past posts:

LCC 3.1 will be the first LCC version that supports Snow Leopard 32 and 64 bit.

Its targeted release date is 2 weeks or sooner.

Updated subject line.   Message Edited by woody on 09-16-2009 05:20 PM

Updated Message Body:  (post on page 5)

http://forums.logitech.com/logitech/board/message?board.id=macmice&thread.id=2193&view=by_date_ascending&page=5

The fact is we missed our target release date.  Please don’t read the following reasons as excuses.
1. I will post updates once I have a solid release date.

2. We have introuced a lot of Unifying products which implemented new RF technologies this summer.   Although our engineering resource was streched but we were still confident to release LCC in time or two weeks after Snow Leopard at the time of planning.

3. In the original planning, the LCC3.1 release date was between mid Sep and early Oct.

4. Snow Leopard came out earlier, and we thought we might able to release it in two weeks time but we missed it.

5. Our engineering group is working hard to get LCC 3.1 released ASAP but it most likely won’t be ready this Friday.

Comments are closed.

添加到你的收藏夹

Del.icio.us    Google书签    Digg    Live Bookmark    Technorati    Furl    Yahoo书签    Facebook    百度搜藏    新浪ViVi    365Key网摘    天极网摘    和讯网摘    博拉网    POCO网摘    添加到饭否    QQ书签    Digbuzz我挖网